Feder Corliss Associates, Century 21 Masters Luxury
A paved section of the Bob Jones Trail curves through mature trees in Avila Beach.

Where to Start the Bob Jones Trail in Avila This Winter

The Bob Jones Trail most people walk runs about 2.5 miles, from Ontario Road down to Avila Beach Drive near First Street. The gap between that trailhead and the City of San Luis Obispo is 4.5 miles, according to The Tribune, and crews began work on the first piece of it this fall. The new pathway is being built on South Higuera Street, miles from the ocean. For the winter of 2026, the trail you can walk is still the Avila stretch. In late October, the county also sent walkers to the Avila Beach end while it repaired the parking lot at Ontario Road.

This season, start at the beach, walk north up the valley, and expect the SLO connection to open in stages over the next several years.

What is being built on South Higuera

On September 1, 2026, San Luis Obispo County Public Works began building Segment 1 of the Bob Jones Pathway. The segment runs between the Octagon Barn and Cloverridge Lane. The county's announcement names Souza Construction of San Luis Obispo as the contractor on a $10.5 million contract. The work is paid for by a federal Active Transportation Program grant through the California Transportation Commission, and the county expects construction to take up to 18 months. KCBX reported that the county held the groundbreaking ceremony in mid-September and that the first segment is set to be finished in 2028.

This stretch matters to anyone who drives South Higuera between town and the 101 interchange. On October 28, the county announced that SoCal Gas would relocate a gas line about half a mile north of Cloverridge Lane as part of the project. The work was estimated at four to six weeks. Flaggers could hold traffic to one direction, with delays of up to 10 minutes. If you count six weeks from October 28, that window runs into the second week of December. The Higuera route through Thanksgiving week may still be slower than usual.

Why the gap stayed open so long

KCBX reported in 2019 that plans for the trail go back to the 1980s and that the first section was built in 1993. Helene Finger, president of the Friends of the Bob Jones Trail, is a civil engineer. She told KCBX at this fall's groundbreaking that she took on the project because her husband's bike commute wasn't safe. "Little did I know, it would take 20 years," she said.

The Tribune's July summary explains most of those years. The county won an $18.25 million state grant in 2021 for the section from Avila Beach to the Octagon Barn. Easements then became the obstacle. Five property owners along the route refused to sell access, and three of them sued the county. Eight other owners accepted a combined $458,300 in easement payments. In October 2024, supervisors approved a "bookend approach" that moved the trail onto Caltrans land next to Highway 101 and around the properties that would not sell. The California Transportation Commission approved the redesign on March 21, 2025. According to The Tribune, supervisors voted 4-0 on July 7 to award the Segment 1 contract.

The 2021 redesign also covered the details walkers will eventually notice. They include an undercrossing and retaining wall at Clover Ridge Lane, added to an environmental review that was first certified in 2015.

The last piece reaches Ontario Road later in the decade

Segment 1 will not reach the trail people walk now. The county says a later segment will connect it to the Ontario Road trailhead, "providing contiguous access between the City of San Luis Obispo and Avila Beach." The state's 2025 programming request describes that remaining section, from Cloverridge Lane to Ontario Road, as 2.8 miles of separated path. It includes bicycle and pedestrian bridges, a road undercrossing, and improvements at the trailhead.

The county's current capital improvement plan gives the schedule. Construction on the southern section is planned to start in fiscal year 2028/2029, and the full project is estimated for completion in fiscal year 2029–2030. The total project estimate is $40.9 million. So a creekside ride from downtown SLO to the Avila Pier is a project for the end of the decade. For now, the trail that runs to the beach starts at Ontario Road.

Start at the beach end

In its late-October notice, Public Works said the Ontario Road trailhead lot had been identified for repairs under the county's Capital Improvement Program and was closed to the public while the work went on. Flaggers handled single-lane closures on Ontario Road on October 27 and 28 and November 3 and 4. The county encouraged walkers to use "the Bob Jones Trail from the Avila Beach trailhead closest to the beach." The Ontario lot is the one with accessible parking and restrooms. The beach-end entrance near Avila Beach Drive and San Miguel Street, a block north of the sand and the park, has street parking only.

From the beach end, the path is paved and mostly flat. It follows San Luis Obispo Creek and runs behind the Avila Valley Barn fields. A bridge over the creek leads to the Avila Beach Estuary. The trail is open dawn to dusk, and dogs must be leashed. In late November that means an early start or a walk at midday. Visit Avila Beach measures 3 miles from the Ontario lot to the end of the Avila Pier, so a round trip from the beach end to Ontario and back is a solid five miles before you add a stop.

What is open along the way this December

The stops along the valley stretch have their own winter schedules.

Mulligans Bar + Grill at The Avila, the golf resort, is open to the public without a tee time, from 8 a.m. to 6 p.m. Sunday through Wednesday and 8 a.m. to 8 p.m. Thursday through Saturday. The patio has heaters and fire pits. There is also a public café at Avila Bay Athletic Club near the trail.

The Secret Garden at Sycamore Mineral Springs sits just off the path. It is open daily from 10 a.m. to dusk, weather permitting. Mornings bring coffee and cinnamon rolls, and afternoons add baked goods, salads, beer and wine. The Harvest Stand there sells produce from the garden. In December, the Visit Avila Beach events calendar lists tree-lighting evenings in the garden on Fridays and Saturdays from December 4 through December 26. Each one features a 25-foot lighted tree with holiday drinks and cookies. The calendar also lists a free tree lighting with a Muppet movie on December 18. Those evening events run past the trail's dusk hours, so drive in for them rather than walking.

If your walk turns into a soak, Sycamore rents 24 private hillside tubs by the hour. Reservations run from 8 a.m. to 10:45 p.m., and its summer 2026 rates were $25 per person per hour Monday through Thursday, $30 Friday through Sunday and $35 on peak and holiday dates. A four-hour public mineral pool pass costs $30 per person, subject to availability. Down the road at 250 Avila Beach Drive, Avila Hot Springs lists day use of its heated freshwater pool and 104°F artesian mineral pool at $29 for adults. Its posted hours are 8 a.m. to 9 p.m., and the site notes that hours vary by season.

The Avila Valley Barn stand, beside the fields the trail runs behind, is open daily from 9 a.m. to 5 p.m. Its seasonal page lists November 23 as the date Christmas trees arrive. The barn's food counters keep separate hours, and the Smoke House and Chicken Shack serve a limited menu on Tuesdays and Wednesdays.

Back at the beach end, the Friday farmers market that filled Front Street in September closed its 2026 season on September 25. We wrote about that market's stacked September Friday. For more on how the town and the valley fit together, see our Avila Beach neighborhood page. The other end of the future trail is covered on our San Luis Obispo page.

If you are weighing a move between the two ends of this trail, or wondering how a home near Avila Valley fits your plans as the path to SLO takes shape, the team at Sara Corliss would be glad to talk it through over coffee, maybe at the Secret Garden. Schedule a free consultation whenever the timing feels right.

Work With Us

Benefit from thoughtful representation, market expertise, and a relationship-driven approach designed to create a seamless real estate experience from start to finish.

Follow Me on Instagram